PDA

View Full Version : Project Update:



cyclone
01-27-2002, 11:29 AM
Well we flipped my hull over last night. It was scary! We lifted the front with a forklift and chain and lifted the rear using an engine hoist and heavy duty tow strap looped around the pump. The bottom is all sanded down ready for filler. I should prepped for paint by next weekend. I'll have pictures later in the week.

77charger
01-27-2002, 11:33 AM
About how long did it take.I have my pump out right now and am pulling the motor to ease the pump install.Was thinking this will be a good time to paint the trailer.

cyclone
01-27-2002, 11:53 AM
it took about ten minutes to lift the boat and flip it. You could do it with a pair of engine hoists if you dont have access to a forklift. After I flipped it, I laid it back down on some padded 2x4's that I laid across the trailer.

cyclone
01-27-2002, 11:53 AM
it took about ten minutes to lift the boat and flip it. You could do it with a pair of engine hoists if you dont have access to a forklift. After I flipped it, I laid it back down on some padded 2x4's that I laid across the trailer.