View Full Version : New garage/shop



havasu5150
02-01-2006, 07:57 PM
It's been a long drawn out ordeal, but my new shop is almost complete. Need to epoxy coat the floor, move in my toys and tools add electrical in a month or two. :D

TCHB
02-01-2006, 08:03 PM
Is this garage in Havasu>

H20Advantage
02-01-2006, 08:04 PM
Looks nice!!! What are the dimensions?

havasu5150
02-01-2006, 08:06 PM
I wish it was in Havasu!....It's in Buckeye.
Dimensions are 42' Deep by 36' wide

al cole'holic
02-01-2006, 08:28 PM
It's been a long drawn out ordeal, but my new shop is almost complete. Need to epoxy coat the floor, move in my toys and tools add electrical in a month or two. :D
Steel building?? I am looking into some steel deals right now...

Hardly Satisfied
02-02-2006, 02:25 AM
Nice

havasu5150
02-02-2006, 04:54 AM
Yes it is a steel building. Im happy with the quality, has some service issues, :mad: but that is over with now!

prosthogod
02-02-2006, 06:51 AM
what was the cost difference between conventional build and steel? If you know.

Moneypitt
02-02-2006, 07:05 AM
Now that boys and girls is sexy. Even in Buckeye that is a cool garage/shop by anyones standards. I am continuly frustrated by lack of shop/storage space, and dream of something like that,(only in my dreams its much larger), and be able to have the toys and the tools/equipment inside.............MP

burtandnancy
02-02-2006, 09:33 AM
wheres the swamp cooler?

rivercrazy
02-02-2006, 02:37 PM
bump

Moneypitt
02-02-2006, 04:33 PM
You gotta watch those swamp coolers, they create RUST on things you really didn't want to get rusty. In that part of the country you gotta have some type cooling/heating just don't let it get too humid..........MP

DansBlown73Nordic
02-02-2006, 04:44 PM
Back a few months ago was a story in the local paper. Some folks paid for a 30x50 steel building. Then the place went out of business. They were shit out of luck!!!! Pay for it when it is delivered..... :crossx: :crossx:

havasu5150
02-02-2006, 06:35 PM
In a major housing boom like here in the Phx area, finding someone who would build a single unit like this would be tough. I figure a stick building would have been roughly double, and would have taken substantially longer. Scheduling concrete was difficult and in the 4 months from the initial quote until ready to pour (BS Permit process) the price increased by a few thousand.
I'm applying the floor coating this weekend and will be ready to move all of the toys and such the following. :rollside:
Getting a portable A/C unit to roll around inside. Once the electrical is plumbed.