PDA

View Full Version : Christmas Schematic



RitcheyRch
12-13-2007, 02:09 PM
Engineers don't leave out any details do they?? :D :D :D

yopengo
12-13-2007, 02:12 PM
LMAO....That is classic. :D

Cigalert
12-13-2007, 02:18 PM
The elevation drawings are not complete for the Health Department. There are no FRP or washable surfaces along with a continuous floor up the walls. No scheduled refridgeration for the milk and not enough air CFM internally for there to be no air curtain above the fireplace opening. That is, IF you were serving milk and cookies. I guess santa is SOL on food services.

uvindex
12-13-2007, 05:14 PM
CONCRETE:
IF CONCRETE IS BEING USED THEN YOU'VE DONE SOMETHING WRONG
LOL :)