Page 2 of 4 FirstFirst 1234 LastLast
Results 11 to 20 of 33

Thread: Finally Ready

  1. #11
    FuelInMyVeins82
    Ya clean looking boat. What she run on gas alchohal :idea: Also are you planning on racing it and if so what kinda times are you hoping to run. Oh ya, dont get wet or that things gona shock the shit out of ya!!

  2. #12
    ONAROLL
    Well Done, drive the hell outa her......

  3. #13
    Unchained
    Looks like some real nice assembly and rigging work there.
    How long will you be able to run it with a solid block ?

  4. #14
    BAE_557
    What she run on gas alchohal Nitro / Alcohol mix
    Also are you planning on racing it and if so what kinda times are you hoping to run. I might take it to Ming later on this year
    How long will you be able to run it with a solid block ? 1/4 mile or 8.5 gallons of fuel, which ever comes first
    Very What kind of speeds are you expecting? The pump and hull are setup to Blown Fuel Jet specifications.

  5. #15
    FuelInMyVeins82
    Thats rad 1/4 or 8.5 gallons of fuel holly shit. Ya i thought it looked like a alchohal or top fuel deal but there was only one distributer so i wasnt sure. Who built the motor?

  6. #16
    BAE_557
    Ya i thought it looked like a alchohal or top fuel deal but there was only one distributer so i wasnt sure. Who built the motor? The distributor is an MSD 44 amp Pro Mag.
    Joe Boghosian is the engine builder.

  7. #17
    Unchained
    So how many minutes can one of those motors run before they need to be torn down and the pistons and bearings replaced ?
    It seems like at that level of performance the maintenance would be an incredible expense.

  8. #18
    keithmenard
    RIP. :supp:

  9. #19
    BAE_557
    So how many minutes can one of those motors run before they need to be torn down and the pistons and bearings replaced ?
    It seems like at that level of performance the maintenance would be an incredible expense.
    ENGINE MAINTENANCE, THE ABBREVIATED LIST
    WARM ENGINE TO 160 DEG. AT HEADS BEFORE RUN
    TIGHTEN BLOWER, INTAKE, AND HEADER BOLTS EVERY RUN
    SET VALVES EVERY RUN
    LEAK DOWN EVERY PASS
    OPEN BUTTERFLIES AND HOLD OPEN WITH A RAG AFTER PASS
    MARK HEAD GASKETS AFTER HEAD REMOVAL AND REUSE 5 TIMES
    NEED TO BUILD 50 LBS. BLOWER BOOST
    RUN RODS 15 PASSES TOTAL
    OHM WIRES EVERY PASS
    CHANGE OIL AND FILTER EVERY PASS, CHECK PUMP IF OIL CONTAMINATED
    USE SPECIALTY FASTENERS BURST PANELS ONLY, MEASURE EVERY PASS
    MAG TIMING EVERY PASS
    ANTI-SIEZE PUSHRODS EVERY 3 PASSES
    CHECK BRGS. EVERY 1 TO 2 PASSES
    CHECK ALL RODS AND # 2-4 MAINS
    HAVE EXTRA OIL FILTER TO SPEED UP CHANGES
    CLEAN FUEL SYS. WITH RACE GAS
    STORE PUMP AND BARRELL VALVE WITH GREEN BLENDZALL
    WD-40 THROTTLE SHAFTS
    USE WARM UP SPARK PLUGS, NEW FOR EVERY PASS
    KEEP RUN LOG

  10. #20
    Senior Member
    Join Date
    Feb 2009
    Location
    Irvine, CA
    Posts
    2,885
    Wow ... that's a lot for every pass ... I need you to crew for me :boxed:

Page 2 of 4 FirstFirst 1234 LastLast

Similar Threads

  1. Replies: 9
    Last Post: 11-07-2006, 08:32 PM
  2. Ok finally ready to convert over
    By a catered life in forum Sandbar
    Replies: 32
    Last Post: 09-22-2006, 06:13 AM
  3. Gettin ready to head out.....Finally!!!!!!
    By Mrs. Bordsmnj in forum Sandbar
    Replies: 9
    Last Post: 08-19-2004, 09:03 AM
  4. Slug finally ready for dyno.. motor pics
    By HEAVYBOAT in forum Gear Heads
    Replies: 111
    Last Post: 03-04-2004, 06:52 AM
  5. Ready to Fly
    By JetBoater in forum Outboards
    Replies: 44
    Last Post: 02-22-2004, 04:47 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •