ENGINE MAINTENANCE, THE ABBREVIATED LIST
WARM ENGINE TO 160 DEG. AT HEADS BEFORE RUN
TIGHTEN BLOWER, INTAKE, AND HEADER BOLTS EVERY RUN
SET VALVES EVERY RUN
LEAK DOWN EVERY PASS
OPEN BUTTERFLIES AND HOLD OPEN WITH A RAG AFTER PASS
MARK HEAD GASKETS AFTER HEAD REMOVAL AND REUSE 5 TIMES
NEED TO BUILD 50 LBS. BLOWER BOOST
RUN RODS 15 PASSES TOTAL
OHM WIRES EVERY PASS
CHANGE OIL AND FILTER EVERY PASS, CHECK PUMP IF OIL CONTAMINATED
USE SPECIALTY FASTENERS BURST PANELS ONLY, MEASURE EVERY PASS
MAG TIMING EVERY PASS
ANTI-SIEZE PUSHRODS EVERY 3 PASSES
CHECK BRGS. EVERY 1 TO 2 PASSES
CHECK ALL RODS AND # 2-4 MAINS
HAVE EXTRA OIL FILTER TO SPEED UP CHANGES
CLEAN FUEL SYS. WITH RACE GAS
STORE PUMP AND BARRELL VALVE WITH GREEN BLENDZALL
WD-40 THROTTLE SHAFTS
USE WARM UP SPARK PLUGS, NEW FOR EVERY PASS
KEEP RUN LOG
piece a cake.
I have a hard time with pulling data,re-fueling, one hardware change, quick inspections, a wipe down and warming up in between rounds.
Good luck BAE, keep us posted.