Results 1 to 10 of 10

Thread: What's the Longest You've Waited ???.....

  1. #1
    Liberator TJ1984
    I have had one of these on Order direct from the Manufactuer since January of this year = 9 mos. supposed to only been delayed a few weeks when I first placed the order...no problem ,Custom Knife ? expected a little backorder wait...........well I
    called and they said ...Knives are in stock,boxes are there but they still have'nt gotten the sheaths ready yet :yuk: oh yea it's paid for already
    Do I got a bitch here or am I just too impatient ????
    http://www.darkopsknives.com/photo/11.jpg

  2. #2
    OGShocker
    I have had one of these on Order direct from the Manufactuer since January of this year = 9 mos. supposed to only been delayed a few weeks when I first placed the order...no problem ,Custom Knife ? expected a little backorder wait...........well I
    called and they said ...Knives are in stock,boxes are there but they still have'nt gotten the sheaths ready yet :yuk: oh yea it's paid for already
    Do I got a bitch here or am I just too impatient ????
    http://www.darkopsknives.com/photo/11.jpg
    VooDoo better hope UPS doesn't screw this up...

  3. #3
    voodoomedman
    VooDoo better hope UPS doesn't screw this up...
    I'll just get HR to hire you to come and beat up radio's with a crow bar to straighten everybody out.

  4. #4
    OGShocker
    I'll just get HR to hire you to come and beat up radio's with a crow bar to straighten everybody out.
    For the LAST TIME! It was a 4' X 1.5" rod of aluminium!

  5. #5
    voodoomedman
    For the LAST TIME! It was a 4' X 1.5" rod of aluminium!Don't get lippy with me or I'll send you the wrong color shirts!!
    :crossx: :crossx: :rollside:

  6. #6
    OGShocker
    Don't get lippy with me or I'll send you the wrong color shirts!!
    :crossx: :crossx: :rollside:
    What Fed EX Purple, not UPS Brown?..

  7. #7
    phebus
    It's probably on hold while the FBI, CIA, and Dept. of Homeland Defense check you out.
    That knifes not for cutting, only sticking.

  8. #8
    voodoomedman
    What Fed EX Purple, not UPS Brown?..
    No DHL yellow. Actually white shirts but I'm going to have Threaded pee on them to make them yellow.
    Okay since we jacked this we better answer Liberator's question.
    9 months is too long. Especially for a knife. Hell you can get a custom built boat in two months. And why can't they send you the knife now and then send the sheath when it comes? I'd have cancelled the order already.

  9. #9
    Dave C
    now thats how you get shiat done... LOL
    For the LAST TIME! It was a 4' X 1.5" rod of aluminium!

  10. #10
    Liberator TJ1984
    It's probably on hold while the FBI, CIA, and Dept. of Homeland Defense check you out.
    That knifes not for cutting, only sticking.
    and breakfast,and in the shower....they know more about me than I do !
    Try getting a Suppressed AR-15 :skull:
    It took me 6mos..and a ton of legal crap.......hate to even ask about it in Cali.

Similar Threads

  1. waited to long
    By 63stevens in forum V-Drives
    Replies: 1
    Last Post: 07-24-2006, 02:02 PM
  2. What is the longest...................
    By Debbolas in forum Sandbar
    Replies: 81
    Last Post: 01-20-2006, 10:26 AM
  3. Here's to the longest name in the HBF.
    By OGShocker in forum Sandbar
    Replies: 6
    Last Post: 12-19-2005, 06:15 AM
  4. Coldfire Pics Please I Waited Long Enough
    By taxman in forum V-Drives
    Replies: 3
    Last Post: 05-02-2005, 01:40 PM
  5. What Is The Longest Anyone Has Seen A Jet Last?
    By Hallett19 in forum Bench Racers
    Replies: 12
    Last Post: 04-17-2002, 07:47 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •