6" is pretty thick. Are you parking big rigs on it???? So that's 1500 square feet. 28 cubic yards...should be like $3500 in mud at $125. I don't know LB prices.....plus labor and a pump if needed.
What's the prep need to be?
grading involved?
Lots of steel or none?
Tailgate or pumped? If so how far?
standard mix...or colored?
stamped or stained?
could be between 5 or 10 bucks a sq ft. More info gets a better estimate. :idea:
Prices sure have gone up for mud though......