Finally after building a new shop and getting back in running order I have completed 4 part molds at the same time. This is the first, another 392 valve cover. This one should be on Gene Adams rail this weekend at the time trials. I went with bronze inserts and tubes on the bolt hole flanges for better wear. This will clear the biggest hemi valve trains. The part molds have the dimensions built in for ballistic armor fabrics (blast retention).
The next part is the bullet 3 1/2 gallon fuel tank. Its in the mold now. Its the hardest and probably neatest part I've made yet. Should have pics up Thursday night.
Sorry, the picture is a little dark.
http://www.***boat.com/image_center/...030141-med.JPG